Property Address 1960 East Grand Avenue
El Segundo, CA USA
Year Constructed 1987
Project/Building Architect Gensler & Associates
Finish Glass curtain wall
Lobby Material Marble walls and flooring. Inlaid carpeting
Structure Concrete piles with steel frames. Concrete slab-on grade
Number Of Floors 12
Site Area 5.38 acres.
Rentable Area 247,570
Floor Plate Size 21,000
Floor Load 14.32
Floors Above Grade 12
Slab To Slab Height 12’ 5”
Floor To Ceiling Height 8’ 6”
Ceiling Details 2’ x 2’ suspended acoustical ceiling systems
Window Details Reflective glass curtain wall with punched openings 1/4 “ thick
Column Spacing 25’
Bay Depth 26'2” x 25’ to 36’11” x 25’ (windowline to core)
Elevators 4 US 3,000lb capacity passenger. 1 freight (same). 2 US 2,500lb parking elevators
HVAC Description Central refrigeration plant making chilled water. VAV ductwork distribution systems. Heating s provided by gas boiler. Capacity is approx 19 BTUH per foot.
Electrical System Description 4,000 amps, 480 volts, 3 phase power
Emergency Backup Caterpillar generator rated at 200KW, 250 KVA at 0.8 power factor
Plumbing Description 2 domestic pumps for 6-12th floors. Street pressure for 1st-5th. Supply piping is cooper and drain is cast iron.
Restroom Details 1 men’s and 1 women’s on each floor
Utilities Description Water: City of El Segundo
Gas: The Gas Co
Electricity: So Cal Edison
Telephone/ Fiber Optics: AT&T
Fire/Life Safety Description A combo wet sprinkler/ standpipe system powered by two diesel 750 GPM (each) fire pumps
Building Security Description Card readers at garage, building entrance, and elevators. 24 hour guard. CCTV with 11 cameras.
Parking 926 spaces (3.7/ 1000) 98 spaces in surface lot. 828 spaces in garage
Other Building Amenities Café, Fitness Center, Koi Pond, Putting Green